T Edge Construction, Inc.
  • Home
  • About Us
  • Work Peformed
  • Jobs
  • Photo Gallery
  • Contact Us
  • More
    • Home
    • About Us
    • Work Peformed
    • Jobs
    • Photo Gallery
    • Contact Us
T Edge Construction, Inc.
  • Home
  • About Us
  • Work Peformed
  • Jobs
  • Photo Gallery
  • Contact Us

Projects

Echo Valley Meadows Restoration

Echo Valley Meadows Restoration

Echo Valley Meadows Restoration

The project consists of but is not limited to; bank stabilization, micro-grading, shallow excavation, placement of large woody debris to provide grade control, erosion control, tree protection, landscaping, wetland mitigation, earth anchoring, dewatering, and hydro-mulching.  

Amount: $188,903 

Project Completed October 25, 2013  

Trillium Park Development

Echo Valley Meadows Restoration

Echo Valley Meadows Restoration

Park Development which includes but is not limited to; excavation, erosion control, surveying, rock placement, grading, mainline installation, irrigation, play area installation, concrete walks, walls and curbs, basketball court, shelter, site furnishings, and landscaping. 

 Amount: $ 359,395

Project Completed June 9, 2014

Roger Tilbury Memorial Park

Echo Valley Meadows Restoration

Roger Tilbury Memorial Park

Nature Park Development which includes but  is not limited to;  grubbing and clearing, stump removal, excavation, erosion control, surveying, rock placement, grading, hydro-seeding,  play area installation, concert walks, walls and curbs,  basalt stone stairs, concrete stairs, log fort, site furnishings, asphalt paths and landscaping.

Amount: $ 546,779

Project Completed December 13, 2014

SHARC Parking Lot

April Hill Bridge and Boardwalk

Roger Tilbury Memorial Park

The project consists of but is not limited to; excavation, clearing and grubbing, demolition, storm sewer installation, concrete curb and gutter, sidewalks, base rock installation, paving, striping, signage, vaults and manholes, wood fencing, site furnishings, lighting and erosion control.

Amount: $556,063

Project Completed April 1, 2016

April Hill Bridge and Boardwalk

April Hill Bridge and Boardwalk

April Hill Bridge and Boardwalk

This project consists of but is not limited to;  excavation,  two pedestrian bridge installations, boardwalk installation, clearing and grubbing, erosion control, installation of bridge abutments, rock pathways and seeding.

Amount: 383,900

Colonel Summers Splash Pad

April Hill Bridge and Boardwalk

April Hill Bridge and Boardwalk

This project consists of but is not limited to; Loo and Splash Pad installation, sidewalks, excavation, clearing & grubbing, erosion control, mechanical, manholes and catch basins, landscaping, reinforced concrete, waterlines, sewer and drywells.

Amount: $744,515

Washington Park Transit

Mount Tabor Restoration Reservoir

Mount Tabor Restoration Reservoir

 This project consists of but is not limited to;  excavation,  clearing and grubbing, rock pathways, stone walls, stone bench and hand seeding.

Amount: $92,619

Mount Tabor Restoration Reservoir

Mount Tabor Restoration Reservoir

Mount Tabor Restoration Reservoir

This project consists of but is not limited to; renovation and restoration of concrete walls and sidewalks of reservoir 1. Worked directly with Pioneer water proofing.

Amount: $1,028,541

Fernhill Park

Mount Tabor Restoration Reservoir

Stone Creek Golf Club

 This project consists of but is not limited to; Splash Pad installation, restroom restoration, storm water facility, sidewalks, excavation, clearing & grubbing, erosion control, mechanical, manholes and catch basins, landscaping, reinforced concrete, concrete seating walls, waterlines, sewer, drywell and play area seating.

Amount: $1,014,225

Stone Creek Golf Club

(Current) Urban Forestry Delta Park

Stone Creek Golf Club

This consists of developing an emergency access road which includes but is not limited to; drain pipe, rock and paver installation, and metal access gate.

Amount: $47,750

(Current) Urban Forestry Delta Park

(Current) Urban Forestry Delta Park

(Current) Urban Forestry Delta Park

This project consists of but is not limited to; clearing and grubbing, erosion control, excavation, utility vaults and piping, concrete foundation for pre-fab building and concrete walkways.

Amount: $170,515

(Upcoming) Gilbert Park Renovation

(Current) Urban Forestry Delta Park

(Current) Urban Forestry Delta Park

Starting Project April 2019

Copyright © 2022 T Edge Construction, Inc. - All Rights Reserved.


Powered by GoDaddy