The project consists of but is not limited to; bank stabilization, micro-grading, shallow excavation, placement of large woody debris to provide grade control, erosion control, tree protection, landscaping, wetland mitigation, earth anchoring, dewatering, and hydro-mulching.
Amount: $188,903
Project Completed October 25, 2013
Park Development which includes but is not limited to; excavation, erosion control, surveying, rock placement, grading, mainline installation, irrigation, play area installation, concrete walks, walls and curbs, basketball court, shelter, site furnishings, and landscaping.
Amount: $ 359,395
Project Completed June 9, 2014
Nature Park Development which includes but is not limited to; grubbing and clearing, stump removal, excavation, erosion control, surveying, rock placement, grading, hydro-seeding, play area installation, concert walks, walls and curbs, basalt stone stairs, concrete stairs, log fort, site furnishings, asphalt paths and landscaping.
Amount: $ 546,779
Project Completed December 13, 2014
The project consists of but is not limited to; excavation, clearing and grubbing, demolition, storm sewer installation, concrete curb and gutter, sidewalks, base rock installation, paving, striping, signage, vaults and manholes, wood fencing, site furnishings, lighting and erosion control.
Amount: $556,063
Project Completed April 1, 2016
This project consists of but is not limited to; excavation, two pedestrian bridge installations, boardwalk installation, clearing and grubbing, erosion control, installation of bridge abutments, rock pathways and seeding.
Amount: 383,900
This project consists of but is not limited to; Loo and Splash Pad installation, sidewalks, excavation, clearing & grubbing, erosion control, mechanical, manholes and catch basins, landscaping, reinforced concrete, waterlines, sewer and drywells.
Amount: $744,515
This project consists of but is not limited to; excavation, clearing and grubbing, rock pathways, stone walls, stone bench and hand seeding.
Amount: $92,619
This project consists of but is not limited to; renovation and restoration of concrete walls and sidewalks of reservoir 1. Worked directly with Pioneer water proofing.
Amount: $1,028,541
This project consists of but is not limited to; Splash Pad installation, restroom restoration, storm water facility, sidewalks, excavation, clearing & grubbing, erosion control, mechanical, manholes and catch basins, landscaping, reinforced concrete, concrete seating walls, waterlines, sewer, drywell and play area seating.
Amount: $1,014,225
This consists of developing an emergency access road which includes but is not limited to; drain pipe, rock and paver installation, and metal access gate.
Amount: $47,750
This project consists of but is not limited to; clearing and grubbing, erosion control, excavation, utility vaults and piping, concrete foundation for pre-fab building and concrete walkways.
Amount: $170,515
Starting Project April 2019